Wednesday, February 23, 2011

Solitaire School Unblocked

can eHow.com

Solar energy is a form of energy with great possibilities. However it about 10 years ago only very rarely and sporadically, a photovoltaic system has seen a number of roofs are now in Germany equipped with photovoltaic technologies.

addition to the traditional roof-mounted photovoltaic systems there are also constantly known as 12V PV systems. Those consist of various components and are composed of the following main components: Solar Panel 12V, DC controllers, solar cables, solar battery and inverter. These components can create many small autonomous solar applications.
particularly in the mobile area enjoys a high popularity and the technology today is very common. Most campers are now supplied with a solar mobile home areas. Such a system has the benefit, that the network of power lines independently but still remain mobile. The core of such an installation, the 12V solar panels are installed on the roof of the motorhome.

can installation of such a PV system can be accomplished by a specialist or hand carry. In self-assembly of solar panels on the roof is beginning to investigate whether sufficient space for the solar panels including mounting rails is available. Subsequently, the solar panels be connected to the holder and glued to the roof of the Womo. With a roof duct, the Lines in the interior of the caravan passed and connected to a battery controller. This network is then in turn with the gel battery.

The success of the PV has a number of reasons. Firstly, the solar energy is a renewable energy source. This means there are no natural resources to produce energy with solar collectors are required. Solar energy systems are therefore an extremely environmentally friendly style of energy and carbon dioxide emissions arising from help include block heating plants or coal-fired power plants to be minimized. For others, the solar industry and operators of solar systems from state aid of photovoltaic energy has received. The salary for the current obtained from a photovoltaic system and is subsequently fed into the grid is governed by the EEG. The Renewable Energies Act (EEG) that, by solar energy, wind power and biopower first place. Without government support this technology would not just now so widespread.

Friday, February 18, 2011

Negative Control Respiration

MPP Tracker

when no power outlet available is a 12V solar system certainly a worthwhile investment. All you need is a 12V solar panel and sun, because by using PV can be generated in this way flow. Regardless of location, anywhere in the world. A fascinating idea and a not too difficult.

First, it is but check to realize how such a solar system can be and what components are needed.

Basically you should think about what demands are made on the solar system. Here are some examples:

solar fan
If you want a solar panel with a 12V fan solar system build as you actually need only a suitable 12V fan of the works area. It is important to ensure that the solar panel above the power of the solar fan. The fan just to the solar module Connect and sunlight, the fan automatically starts to hum.

solar pond pump with battery
Again, one can connect the solar panel 12V directly to the pond pump. And the pump is continuing its role to sunlight. But what is if you continuously want to have the pump running? Then we need to make sure that the solar panel can store the solar electricity generated between. This you need a battery and a charge controller. The battery stores the energy (Akkumuator) and the solar controller takes over the solar battery management and protects the battery from deep discharge and overloading. In addition, the solar pond pump can still be controlled by a timer.

laptop with solar
who has in his garden shed no electricity available but would like to add a TV or laptop, can also rely on solar energy. Again, the same conduct. Connect Solar Panel with 12V solar controller and batteries. But since we only by a 12V solar system available, the DC providing we have to expand the line with a voltage converter. This in jargon-called island-inverter converts 12V DC into 230V AC. Thus, then devices such as a netbook with a solar system to be operated.

Thursday, February 17, 2011

New Kates Playground Galleries

AC unit in the 12V solar system

you have decided to purchase a solar system and you want to install themselves on the roof of your RV?

First, you should be concerned about the position of the solar system RV thoughts. The photovoltaic system should ideally be installed so that it is designed parallel to the direction of travel. This has the advantage of the wind turbulence is minimized, also provides such an installation, a lower target for branches that might be caught under the solar panels. The Solara module mounts ABB made of hardened material and provide both a secure connection between mobile home roof and solar modules as well as protection for the solar modules.


first Connect solar panel and solar module mounting

First, the solar panel mounts are connected to the photovoltaic modules. This shall be the spoiler on a flat surface and fits on the solar panels. With a pen to mark the holes in the solar panel and drilled before this. Now, the solar panel is fixed to the brackets with stainless screws.


second Solar module fixed on the roof

The screwed-together parts (bracket and panel) should now be placed on the roof. Preferably with ruler first determine the exact position of the solar system on the Motorhome. Draw the outline of the solar roof spoiler on the surface of the motor home with a pen. Remove the bracket including solar panels and clean them first place at which the solar spoilers are to be glued to the roof. Now enter the glue in the marked areas, and then position them holding spoiler including solar modules at the appropriate points.


third Cabling of solar modules

If you install more than a solar panel on the roof of Womo they must connect these accordingly. Before they start, they should, however, the connection between the roof surface and the solar module support can dry out completely. For easier handling, the solar modules of the screw will now be released again from the support. In the parallel circuit of the solar modules should be a safe, spill-proof and tensile strength to connect. Best solves this with Y-connectors. They offer 2 inputs and one output, and thus can be a cabling complete within minutes. When wiring should always rely on solar cable, as this is UV and heat resistant and is designed for outdoor use.


4th Roof duct on the Womo

the roof duct should be installed in an optimal way near a bay. So as to avoid a complex wiring inside the camper. The indicated point on the roof of the camper, drill two holes for the cable, or alternatively from the inside of the camper top drill. Now position the roof duct, mark and replace the special adhesive. The roof duct position and let dry. Then pull the cord.


5th Charge Controllers

the charge controller inside the camper mount and connect the cables of the solar system. Then connect the solar controller with on-board battery. The charge controller should be installed where possible in the vicinity of the battery to the cable between the solar controller and batteries to keep it under two meters. Now connect the solar controller with the battery.

Wednesday, February 9, 2011

Star Wars Pine Wood Derby Car Designs

Queue terror (of www.spiegel.de)

your call to us void

Call Center is the limbo of capitalism: poor souls burn for hours there with lively jazz music until their ears bleed. The perfidious system have been the company looks for ancient Chinese despots.
When I saw before the Munich Apple Store recently launched a long line because I was hurt my heart. The new pads or pods, which existed there, interested me not. But I would also like to once again stood in line.
queue, what a great experience that! The anticipation, the community - and the goal set in View.
Due to technological progress full stop. Instead, we now sit for hours alone in our apartment - and wait for our call center agent will finally turn.

Lousy manners and look awful music
while waiting in line at least it was fresh in the air. Call Center, however, the limbo of capitalism, here, each sooner or later. The first time it is still fixed, because it gives new customers an extra hotline, which operates on the principles of traditional telephony: you pick a number, and someone answers it.
who is already a customer, the other hand, the listener must push on the cheek before he passed out is. And also can be treated worse than it was at the federal post. My theory is that all the misanthropic Grantler and behavior disorders, which may not even now sell more stamps at the counter, call centers have found a new home. Would normal people talk like each other?

Me: Good morning!

Call Center Robots: The conversation is listening!

Me: What? But why? I have nothing wrong ...

Call Center robot: Only for training purposes.

Me: Who will train? The customer?

Call Center Robots: You have nothing against the measure, right? What to hide?

Me: No, but we could now to my concern ...

Call Center Robot: Hardly. The waiting time is currently 37 minutes. And by the way ...

Me: What?

Call Center robot: "Your call is important to us."

falsetto techno and feel-good jazz
worse than lousy manners is certainly the tooting. Call Center music is always too loud and therefore comes in a two attributes: cheerful jazz, as you could hear on Saturday in shopping centers - or in falsetto adduced before the full plastic techno.
When I recently hung at Air Berlin on hold, I was given the Elektrobimmbumms most of the blood from the ear canal. I found out later, the current song, however, relatively speaking, an improvement on that hit, with the airline struggled petitioners formerly
"butterflies in the stomach / blood kerosene / nose in the wind / and the customer in Siiinnn."
As one suspects, why hang on every seat barf bag. The purpose of the music loop, it is not the way to entertain customers. But to force him to task or at least to sing Sun crap out of that he adds to his fate.

model Ming Dynasty

in history have ever so many poor people as long Listen to music as it is today? Hard to imagine. And yet, the call center also has a historical precedent. It is the ancient Chinese
petition system of the Ming Dynasty not dissimilar. At that time, everyone could still make a pilgrimage to Beijing so insignificant subject to the Imperial Court put forward his case.
Since then knelt for his unjust paddy parcelling first round a few weeks before the Forbidden City and had to be cajoled, meanwhile, by hawkers.
Whether it was music, is not known, but shut up was mandatory. If you still spoke to someone everything was co-written by an official of the imperial secret service, for training purposes.
some point consented then an ill-tempered inbound Mandarin, an examination of the concerns expressed to promise.
Presumably he bowed it, folded his hands in his robe, and said smilingly: ".. Their petition to the Emperor is important audience, the next available appointment is reserved for you"
also you had a lousy service experience? ! Then write to

=> warteschleife@spiegel.de It would be so easy when you consider how much marketing money spent Munter Telecom company for new customers, while they would only existing customers, or the interested which call the information line operated correctly!

Tuesday, January 25, 2011

Monica Roccaforte Hard

"Your call is important to us to hold the line while we ignore you!"

Daily News Online:

Quiz: What company does the music?

By Samira Zingaro. Updated at 12:15 clock

Quiz: songs in the waiting loop

Question 1 of 9:

Abbas hit "I have a dream "belongs to ...
... Hüssy Keller Electric, Zurich
... Kuoni Travel
... Edipresse Group
Tamedia ...


"We connect you immediately with the next available customer service": Call Center.

[Alt-Text]
drives you impatient to treat you to the office chair with his feet. drumming on the desk. To bite into the back of the pen. And to condemn companies. The wait loop on the phone asks us customer perseverance and optimism. Although many companies today strive for greater efficiency. But as soon rebelled an Icelandic volcano, a raging snow storm sweeps through the airports or the Health Minister Didier Burkhalter contribution towards a party for visual aids from the basic coverage, the wires glow to telephone consultants. Then it says: "Stay on the line. At the moment, unfortunately, all our employees busy. "
needs in such moments, it already very good music to callers to vote gentle. Rather than reflexively excited about the wait loop, we have listened very carefully at this point for once. Ten songs, ten companies. Find out which operating on the phone who takes out business card.

Annoying keyboard shortcuts
Finally, a little tip: Do not wait for the unspeakable bullet "For billing questions, press the One, for questions about your subscription, you press the two. . . »From. Fastest way to often when you type in any sequence. Then it says: "Your key combination could not be detected. We connect you instantly to the next free customer service. voilà "Et. (Tages-Anzeiger)
Created: 01.25.2011, 11:27 clock